Brochure

Prototype Testing and Deployment

In implementing new technologies, the transition from prototype to deployment can be exciting, gratifying and daunting. Challenges abound. The technology may not be optimized for scaling. Production costs may be too high. Complex design packages can reduce interoperability and integration success. The prototype may not support rapid fielding. And, in the race to meet increasing requirements, bottlenecks can quickly form.

Prototype testing, Deployment, New technology, Production cost, Complex design package, Integration success, Project management services, Innovation team, Interoperability, Rapid fielding, Financial Valley of Death, Technical Valley of Death, Primary design review, Supply Chain Management, Configuration Management, Engineering and Design, Project Planning, Requirement Gathering, BOM Verification, Tooling Systems,and Subsystems, Rapid Machining and Testing, Low Rate Assembly, Manufacturing Development, Production Planning, Second Sourcing, Proprietary Software, Control Plans, Lean Operation, Quality System Feedback Loops